412-788-8120

1000 Church Hill Road | Pittsburgh, PA 15205 |  Facebook

Office Hours: Monday - Friday: 8am - 4pm

The Neville Island Bridge, which is located in Neville Township, Robinson Township, and Glenfield Borough, Allegheny County, will soon undergo extensive rehabilitation. Work on the bridge will begin on March 26, 2020. This project is estimated to cost $60 million dollars and is expected to be complete by the fall of 2022.

The scope-of-work for the two mainline bridge structures includes structural steel repairs, fatigue-prone detail retrofits, full structure paint, deck joint replacement and repair, deck and parapet concrete repairs, bearing replacement and repair, substructure concrete spall and crack repairs, bridge drainage downspout repair, update approach guiderail/bridge barrier connections and repair light poles. The general preservation scope-of-work for the four sign structures includes: Replacement of various bolts and sign connection hardware, replacement of deteriorated conduit and fittings, replacement of damaged luminaries, and full and spot painting with galvanized coating.  A detour will be utilized for some parts of the project and has the potential to impact motorists.

Please contact Mike Sokol, P.E., Project Manager, at 412.429.4898 or via email at msokol@pa.gov if you have any questions or concerns.

Click here for a downloadable PDF containing more information about this project.